Operating instructions
Instal. GAL
A
®
21 / 40
VERO DESIGN NV © all rights reserved +32 33 85 06 91
Installation instructions Operating instructions
G
A
L
A
When the fireplace will be build in in a tiled stove, follow the installation instructions of the relating
manufacturer !
When the fireplace will be build in in a brick wall or other, you must use heat-resistant insulation !
DO NOT PLACE ANY FLAMMABLE MATERIAL ON THE INSIDE OF THE CHIMNEY-PIECE !
By using insulation, the heat spreads more controlled : Through the glass and if wanted, also through
the warm air vents, without damaging heat-sensitive materials in the vicinity. This way you avoid
cracks and damage in the bricks and stucco work because of the heat stowage and heat transfer.
!
Installation
General
We recommend :
Promaglaf HTI thickness 25,4mm 100kg / m³
Profits and qualities of Promat Promaglaf HTI:
work hygienic, non classified
highly thermal resistant upto 1260°C
resistant to high temperature fluctuation
low heat conduction and heat absorption
free from unpleasant odor










