Installation Guide

12
Stair Railing Installation (continued)
5
Preparing the bottom rail installation
Place the bottom rail between the posts. Using the bracket
as a guide, mark the location of the holes on the posts.
Remove the rail before pre-drilling the holes.
Predrill the holes with a 5/32 in. bit, angling slightly inward
to allow for clearance from the rail once repositioned for
securing.
6
Installing the bottom rail
Place the crush block on the stair tread surface midway
between the posts and glue to bottom of bottom rail.
Secure the bottom rail to the post at both ends using the
2in. screws (FF). DO NOT OVERTIGHTEN.
NOTE: Using extended drill bits is recommended to
prevent damage to the rail, and allow a more perpendicular
driving angle.
FF
7
Positioning the top rail
NOTE: Baluster length may vary slightly. Make sure all
balusters are cut to the correct length.
Insert a baluster into the rst and last holes in the bottom
rail. Carefully position the top rail over the balusters. Lower
until the balusters are fully inserted.
With the top rail fully seated, and using the top bracket as
a guide, mark the location of the holes. Remove the rail
before pre-drilling the holes.
8
Drilling the top rail holes
Predrill the holes with a 5/32 in. bit, angling slightly inward
to allow for clearance from the rail once repositioned for
securing.