Position the bottom rail
brackets to the ends of the
bottom of the bottom rail
(side opposite the one with
the routed holes.) Screw into
rail with #10 x 1" screws.
NOTE: Within the Pro-
Rail bracket kit (mod-
el#73013131), the two bot-
tom rail brackets are the
larger ones.
Slide balusters into the routed holes of the bottom rail. Lock
tabs on balusters must face the outer edge of routed holes.
a. Measure up 28-7/8" from top of bottom rail and make a mark.
This will be the location of the top of the bracket
b. Using 5/32" drill bit, pre-drill top rail bracket screw holes into
post. Drill through bracket hole, vinyl post jacket, and wood or
steel post and loosely install fi rst #10 x 2-1/2" screw.
c. Repeat drilling process for remaining screws, and tighten
all screws.
Attach top rail to balusters: Begin at one side of rail and align fi rst baluster with the fi rst routed hole on the bottom side of the top rail
and snap top rail into position. Continue down the line of balusters installing balusters into top rail.
Position the top rail brackets at the ends of the
underbelly of the top rail. Screw into rail with
#10 x 1" screws.
Place top rail gaskets at ends of the installed top rail, if
desired, to cover any gaps created during installation.
Slide bottom rail in between posts and rest on top of wood
spacer blocks.
Screw bottom rail brackets into post (routed hole side of rail,
facing upwards) with #10 x 1" screws.
Place bottom rail gaskets at ends of the installed bottom rail
if desired, to cover any gaps created during installation.
Remove/discard the temporary spacer blocks.
7
7
9
9
10
10
11
11
8
8
Install Bottom Rails
Install Balusters
Install Top Rail Brackets to Post
Install Top Rail
Install Bottom Rails
28
7
/
7
/
7
8
/8/
"
a.
b.
b.
b.