Installation Guide

9
5
5
6
6
Drive two 1
1
1
1
4
4
" self-tapping screws through upper hinge into
post
post
(use the inside
holes for this step). Repeat for bottom hinge. Screw additional eight screws into
hinge.
Install latch per instructions (Varies by style).
Re-tighten the spring tension of hinge to level started at (turn cam clockwise
1
1
1
2
2
turn).
3
3
4
4
Once the concrete has completely set around the gate post(s) (may take 5-7
days), gates may be hung.
Set the hinges on the gate. Line up the top of hinge with top of top gate rail. Line
up bottom of bottom hinge with bottom of bottom gate rail. Drive two 1
1
1
1
4
4
" self-
tapping screws through upper hinge into
gate
gate
(use the inside holes for this step).
Repeat for bottom hinge.
Hang gate to post. Make sure the horizontal rails of the gate are at the same level
as the horizontal rails of the fence panels. Do this by either lifting gate by hand, or
by inserting temporary spacer blocks under the gate to keep gate in place while
mounting it to gate post.