Instructions / Assembly

©2016 Universal Forest Products, Inc. All rights reserved.
68956 U.S. Hwy 131, White Pigeon, MI 49099 616.365.4201 8774_3/16
www.ufpi.com
Assembling the panel
STEP 1
Install first post with concrete (See “Digging postholes” and fig. 1).
STEP 2
Slide the bottom rail into place at the bottom of the routed
post (fig. 2).
STEP 3
With the bottom rail placed, secure a U-channel to the center of
the post using the provided screws. The U-channel needs to sit
above the bottom rail. Set a screw every 20 inches (fig. 3).
STEP 4
Install the second post into the ground and temporarily secure
into place. Set the bottom rail into the second post and level.
(You will secure the second post with concrete in Step 8.)
Repeat Step 3 to secure a U-channel to the second post (fig. 4).
STEP 5
Slide the first picket into one U-channel so that its perpendicular
to the bottom rail. Slide the bottom of the picket securely into the
channel of the bottom rail. Continue installing each picket. The
pickets feature a tongue-and-groove design so that each picket
fits securely into the one next to it. Repeat with each picket until
panel is complete (fig. 5).
STEP 6
When all pickets have been placed, insert the mid rail into the
middle routed hole in the first post. The mid rail has a channel on
one side and routed holes on the other. Insert the rail channel-side
down. Working from one side to the other, slide the rail over the
pickets. In order to insert the rail into the routed hole in the second
post, shift the post slightly until the rail can be fitted (fig. 6).
STEP 7
Insert the black aluminum balusters into the routed holes in the
mid rail (fig. 7).
STEP 8
Insert the top rail into the routed hole in the first post and carefully
place the top rail over the balusters, making sure each baluster
slides into each routed hole in the top rail (fig. 8). In order to insert
the rail into the routed hole in the second post, shift the post slightly
until the rail can be fitted. Once the rail is securely locked in, the
pickets will form a solid panel.
Backfill the second post with concrete and make sure it’s set
before moving down the fence line. This will always allow one post
to be anchored while each panel section is assembled. To continue
building your fence line, repeat Steps 1-8.
WoodbridgeStep2.ai
WoodbridgeStep3.ai
fig. 2
fig. 3
WOODBRIDGE BALUSTER TOP AND CLOSED PICKET TOP PANEL
ASSEMBLY INSTRUCTIONS, CONTINUED
WoodbridgeStep4.ai
WoodbridgeStep6.ai
WoodbridgeStep5.ai
WoodbridgeStep8a.ai
fig. 4
fig. 6
fig. 5
fig. 7
fig. 8