Instructions / Assembly

Dover Gate Kit
Assembly and Installation Tips
To complete your project,
you will also need:
•Doverfencepanel
•Drilldriver
•¼”drillbit
•Circularsawwithane-toothbladeorahandsaw
•7/16”wrench
•Tapemeasure
•Pencil/marker
•Safetyglasses
•4x4treatedwoodpost
Planning
•Priortoconstruction,checkwithyourlocalregulatory
agencyforspecialcoderequirementsinyourarea.
•Contactyourutilitysuppliertolocateandmark
undergroundlines.
•Carefulplanningandmeasuringofyourfenceproject
isessential,asmovingpostsaftertheconcretesetsis
extremelydifcult.
Digging Post Holes
•Digpostholeforthehingepost18”to24”indiameter
and36”to42”deep(dependingonlocalordinanceor
expectedfrostdepthinwinter).Werecommendthatyou
insertapieceof4x4treatedlumbertosupportthegate
hingepost.SeeFig.1.
•Actualgatesizewillvary.Theinsidepost–to-postdimension
willbethewidthofthegateplus1-1/4”.Double-check
all measurements!
Assembling the Gate
Note: For optimal performance and aesthetics, we recommend a walk gate width of
40-1/2”. This is accomplished utilizing the width of 4 pickets from the Dover fence
panel.
•Measuretheopeningwhereyourgateistobeinstalled.Gatewidthwillneedtobe 
reducedby1-¼”toallowfora5/8”gaponbothsidesofthegatebetweentheposts.
•MeasureandmarktheDoverfencepaneltothedesiredsize.Thefencepanelwill
needtobetrimmed3-1/2”lessthanthedesiredgatewidthtoallowforthedimensions
ofthegatejambs.Foreaseofassembly,itisrecommendedtoutilizefullfencepickets.
Ifapicketdoesneedtobetrimmedtolength,theroughedgeshouldbeplaceinsidethe
gatejamb.
•Removethetop&bottomfencerailsfromthepicketsandtrimtothedesiredwidthusing
acircularsawwithane-toothbladeorahandsaw.TheDoverfencerailshavetabs
oneachendforinstallationintothefenceposts.Thetabbedendsmustbetrimmedoffthe
paneltocreateaatfacefortheinstallationofthegatejambs.SeeFig.2.Layallgate
componentsoutonaat,cleansurface.Re-assemblethepanelbyinsertingthepickets
intothebottomrailrstandthenslidingonthetoprail.Allrailsneedtobeushwith
thepickets.
dovertrim.ai

Summary of content (4 pages)