Installation Instructions

Page 3L118 1210A
Wall Side
5 ¼”
Electrical
Vent
Holes
8” Outlet
Centerline
of Hood
5 ¼”
4 ½”
1 ¾”










 


Installation Details
1) Read all instructions thoroughly before beginning installation.
2) When installing a ZTH wall mount hood, it is recommended that the bottom edge of the hood be located no more than 30”
above the cooking surface. Exceeding the recommended maximum mounting height may compromise performance.
3) IF THE HOOD IS TO BE “BACK VENTED”, PROCEED DIRECTLY TO STEP 4.
Install the duct(s) from the outside of the home to the ceiling over the exhaust outlet(s) of the hood. The end of the
duct should extend 1” below the ceiling. Consult the connection diagrams (below) for further details on exhaust outlet
placement.
Use duct tape to seal all joints. A complete listing of available Vent-A-Hood ducting materials is provided on the back
page of this instruction sheet.
Transition heights are as follows:
Dual Blower (B200): 8” round duct will connect directly to the exhaust outlet of the hood.
Single and Dual Blower (B100 & B200): 6” round duct will connect directly to the exhaust outlet of the hood;
8” round duct will connect directly to the exhaust outlet of the hood.
Optional 10” round combination transition (VP562, sold separately) is
17 1/2” tall.
Shown with duct cover installed (sold separately).
900 CFM B200 Dual & B100 Single Blower
(Top View)
600 CFM B200 Dual Blower
(Top View)
Connection Diagram (36” - 48” Widths) Connection Diagram (54” Width)