Installation Instructions

Page 4L116 0611A
Centerline
Of Hood
Centerline
Of Hood
¾”
Electrical
Vent Holes
2 ⁄”
5” x 16”
Exhaust
Opening
8” Transition
Opening 9”
Above To p
of Hood
9"
16"5"
8" Round 8" Round
12"
9"
12" Transition
Opening 11 ¼"
Above To p
of Hood
1 ¾"
8” Blower
Outlets
Vent Holes
5 ½"
10 ½"
Centerline
of Hood
Centerline
of Hood
Electrical (2)
12"
11 1/4"
Installation Details Continued
1100 CFM T400 Cluster Blower
(Top View)
VP564 Transition
(Included)
Transition Installed
(Side View)
TPSLE Connection Diagram (48”- 66” Widths)
550 CFM T200 Dual Blower
(Top View)
VP565 Transition
(Included)
Transition Installed
(Side View)
TSLE Connection Diagram (36”- 48” Widths)
6) Remove the three screws retaining the blower motor(s). Unplug
and remove the motor(s), taking care not to damage the blower
wheel(s). It is not necessary to remove the blower wheel from
the motor.
5) Remove the shipping tape that is securing the E-Z Clean shields inside the hood. Remove the E-Z Clean shields by
lightly pulling each toward the end of the hood. Gently close the back draft dampers from the top side of the hood. To
remove the blower housings, unsnap the suitcase latches (one on each side of the housing). The housings should be
pulled forward and gently “tipped” to clear the blower wheels and then out of the hood.