Instructions / Assembly

20 VELUX
®
16
17
TZR/TZRL
Pan head long
TZRQ
Pan head short
3
4
"
(19 mm)
1
3
4
"
(45 mm)
ENGLISH: Tape all joints.
Note: For rigid sun tunnel assemblies, it is
generally recommended to secure transmit-
tance of loads to the roofing structure by
using suspension kit ZTZ 203.
ESPAÑOL: Asegure todas las juntas con
cinta.
Nota: Para montajes de túneles solares rígi-
dos, generalmente se recomienda asegurar la
transmisión de carga a la estructura del techo
mediante el kit de suspensión ZTZ 203.
FRANÇAIS : Recouvrez tous les joints de
ruban adhésif.
Note : Pour l'assemblage d'un tunnel de lu-
mière rigide, il est généralement recommandé
d'assurer le transfert de poids de la structure
à la toiture en ajoutant la trousse de suspen-
sion ZTZ 203.
ENGLISH: Center the lens on top of the curb
and secure with #8 1¾" (4.2 x 45 mm) pan
head stainless steel screws provided. Screws
will penetrate the curb by at least ¾"
(19 mm).
Apply downward pressure to the top of
the lens while securing the screws.
Do not overtighten the screws.
ESPAÑOL: Centre el cristal sobre el brocal y
fíjelo con los tornillos de acero inoxidable de
cabeza chanfleada de #8 1¾" (4.2 x 45 mm)
suministrados. Los tornillos penetrarán el
brocal un mínimo de ¾" (19 mm).
Aplique presión sobre el armazón del
cristal mientras inserta los tornillos.
No apriete demasiado los tornillos.
FRANÇAIS : Centrez la lentille sur le cadre
et fixez-le avec les vis cylindriques en acier
inoxydable #8 1¾" (4.2 x 45 mm) fournies.
Les vis seront insérées dans le cadre d'au
moins ¾" (19 mm).
Appliquez une pression descendante sur la
partie supérieure de la lentille lors de l'instal-
lation des vis.
Ne pas serrez les vis de façon excessive.