Instruction manual

Assembly
- put back cover including static seal ring in place against steel bracket; mind upright position of supply channel for seal.
- place at rubber gasket in position.
- put a spacer (thickness 2 mm) between back cover and steel bracket (adjusting pre-load on seal).
- put impeller back into position; mind correct position of all rotating parts.
- push impeller rmly as far as possible; hold that position and secure front hex. screw in coupling.
- remove spacer from back cover.
- put pump casing and SS plate back into place.
- mount bolts and tighten them gradually.
- turn safety guard so that holes are pointing downwards (drain in case of leakage).
Check for free rotation by turning cooling fan by hand.
Prior to operation of the pump check direction of rotation as indicated by arrow on the motor.
Testing the rotation has to be done ooded with liquid.
© Hendor - Quality Pumps & Filters - 7 - Info 28640/R0