Wood Pergola Instruction Manual lf you have any problem, please E-mail us at customerservice@veikous.com.
Care And Warning Do not use this product in extreme weather lt will cause product damaged directly or shorten product service time drastically in extreme weather. Bolts can loosen over time.Be sure to check bolts occasionally, tightening at least twice a year. Check all screws for tightness before and during usage of the unit. Minimum of 2 people is required for a safe assembly of the product.
Parts Identification Hardware 20mm H X12 50mm G X132 70mm F X16 90mm E X28 100mm D X36 120mm C X18 B X48 A X16 I X6 J X8 K X16
13 x4 4 x7 8 x8 10 x8 3 x4 9 x8 5 x10 6 x2 12 x4 7 x2 2 x12 1 x4 11 x2
STEP1-1 REPEAT 4 TIMES 1 --------- ----- - - - - - - - - - - - - - - - - - - - - - G 50MM - - --------- - - - - ----- J Place an L-shaped Bracket (J) at the bottom of the Post (①), noting that the top and bottom of the Post are different. Place the L-shaped Bracket (J) flush at the bottom, and then fasten it to the Post with three Screws (G) through the pre-drilled holes.Turn the Post around. Install the second Bracket on the Post as shown. (Two L-Brackets per Post).
STEP1-2 - - - - - - - - - - - - - - - - - - - - - - - --------- - - - ----- - - - - - - - - - - - - - - - - - - - - - - - --------- - - - ----- - - - - - - - - - - - - - - - - - - - - - - - - --------- - - - - - - - - - - - - - - - - ----- - - - - - - - - - --------- - - - ----- lnstall the rest six Brackets(J) on the other three Posts(①)as shown.
STEP2 12 - - - - - 11 - - - - - - - - 2 TIMES - - - - - - - REPEAT - - - - - - - - - - - - - B - - - - - - - - - - - - - - - - 12 - - - - - - - - - - - - - - - - - - - - - - - - - - - 7 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 6 Connect the two long Header Boards(⑥&⑦) and three short Header Boards(one 11 and two 12
STEP3 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - REPEAT - 2 TIMES - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - -- - - - - -- - - --- - - --- - - -- - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
STEP4-1 REPEAT E G E 5 ------ --- G ------ --- ------ --- ------ --- ------ --- ------ --- ------ --- G ------ --- 4 5 E E Fasten the Top Rafter Board(④) to the two Bottom Rafter Boards(⑤) with four Screws G and four Screws E.Then install the rest Rafter Boards. Finally you will get seven assembled Inner Rafters.
STEP4-2 REPEAT E G E G ------ --- ------ --- ------ --- ------ --- ------ --- ------ --- ------ --- G ------ --- 4 3 E 3 E Next,fasten the Top Rafter Board(④) to the two Bottom Rafter Boards(③) with four Screws G and four Screws E.
STEP5 --------- --------- --------- ----------------- --------- --------- --------- Lift the two Outer Rafts into the notches of the Headers. Place the Rafters so that the marks on the Rafters are flush with the outside of the Headers. Connect the Rafters to the Headers on both sides with eight Screws (C) through the pre-drilled holes. (Two Screws on each side of the Rafter.
STEP6-1 C 120mm ------ ---------- ---------- Now install the inner Rafter and lift it into the notches of the Headers. Connect the Rafter to the Header with two Screws (C) through pre-drilled holes. (One Screw on each side of the Rafter).
STEP6-2 ---------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- Now install all remaining four Inside Rafters as shown in previous step.
STEP7 ------ ------ 10 ------ G F Locate the Brace(⑩).Make it flush with the outside of the Header and outside of the Post. Fasten it with four Screws(Two Screws G and Two Screws F) through pre-drilled holes as shown.
STEP8-1 100mm D ------- ------- ------- ------- ------- ------- 2 Locate the Stringer (②). Put it on the top of the Rafters. Pay attention to the direction of the Stringer. Position the Stringer firmly into the notches. Fasten each Rafter with nine Screws (D) through the pre-drilling holes.
STEP8-2 2 Install all remaining Stringers as shown in the previous step.
STEP9 H 20mm ------ ------ ------ ------ I ------ ------ ------ ------ ------ ------ ------ ------ ------ ------ Locate the Part(I).Place it on the top of the Stringers(④). Fasten it with two Screws(H) through pre-drilled hole.Then install all remaining Parts as shown.
STEP10 ------ --- ---- ---- ----- --- ---- ---- ------ ---------- --- ------ - ----- --- ---- ---- 8 G ------ ----- 9 Locate the Post Skirt Pieces(⑧&⑨).Place the four Post Skirt Pieces against the post on the side. Fasten the Post Skirt Pieces together with sixteen Screws(G) through pre-drilled holes at each Post.Repeat this step on the second Post.
STEP11 K ------ ------ K x16 <15>
Enjoy your products! lf you have any problem, please E-mail us at customerservice@veikous.com.