Instructions / Assembly

NOTE:
Put another
2 Screws(41)
in this 4 tubes
for next move
H 2
41
24
18A
42
17
18A
18B
24
41
42
17
41 41
17
8
2
2
2
24
41
8
4
24
24
17
18A
18B
17
17
17
17
17
17
17
18B
18A
8 T-Shaped screws are supposed to be placed in advance on the
2 No.18B and 2 No.17 Tubes. Refer to the Arrow for the Specific Place.
Step8-2: Roof Wall Frame Assembly
Step8-3: Roof Frame Assembly