Specifications
CHAPTER 8: TIMING ANALYSIS
VIEWING TIMING ANALYSIS RESULTS
ALTERA CORPORATION INTRODUCTION TO QUARTUS II ■ 153
Figure 5. Timing Analysis Results in the Compilation Report Window
If you want to generate timing results using both the fast (best-case) timing 
model and slow (worst-case) timing models, you can specify that the Timing 
Analyzer should analyze and report timing using both the fast and slow 
models, and display the results in separate sections under the Timing 
Analyzer Section. If you want to view lists of unconstrained timing paths, 
you can also specify that you want to include a Timing Constraints Check 
report. 
Making Assignments & Viewing Delay 
Paths
You can access the Locate in Assignment Editor, List Paths, and Locate in 
Timing Closure Floorplan commands directly from the Timing Analyzer 
sections in the Report Window to make individual timing assignments and 
view delay path information. In addition, you can use the list_path Tcl 
command to list delay path information.
You can use the Locate in Assignment Editor command to open the 
Assignment Editor and make an individual timing assignment on any path 
in a Timing Analyzer report. This feature allows you to easily make point-
to-point assignments on paths.










