Installation manual
Série 32 Mlift Vector - Prog.Vectorielle Installation manual Chapter V - page 2
CONNECTING ON LANDING: 2 TO 8 LEVELS (SAPB OR COLLECTIVE 1 BUTTON)
P0
P1
P2
P3
P5
P6
P7
P4
INDICATORS
DIGITAL
0V ON
LANDING
0V
SW9 TO SW12 JUMPER POSITION ON BG15
WARNING!
THE LANDING CALL BUTTONS ARE CONNECTED
SAPB or COLLECTIVE 1 BUTTON
8 FLOORS MAX.
(Without Positionning outputs, Duplex,
Level damaged by Fire and double selective service)
24V / 1.2W
24V / 1.2W
NOTHING WILL
BE CONNECTED
ON THESE TERMINAL!
PROGRAMMATION:
MAIN BOARD BG15
ELECTRONIC OUTPUTS
UP OR DOWN
ARROWS
24V / 1.2W
FAULT
LIGHT
24V / 1.2W
IN USE
INDICATOR
24V / 1.2W
FIRE
SERVICE
LIGHT
OUT OF
SERVICE
LIGHTDESCENTE
* FIRE
SERVICE
KEY
ELECTRONIC
OUTPUTS
MUST BE INTERFACED
* OUT OF
SERVICE KEY
E/SX M1 M2 M3
KP27
NF1 NF2 NF3 COMB 24R
KP34 KP29
NF0
POS0 POS1 POS2 POS3
KP23
CREP
0V
24R
KP24
K24
0V
FM
FD
DEF
24R
CL
0V
0V
POM ED
KP22
KP26 K26
KC28
24R
SPG3 SPG1 MHS
SW12 :
SW11 :
SW10 :
SW9 :
VPMP - VHS - GONG
VPMP VHS
MHS
POM/