Installation manual
Série 32 Mlift Vector - Prog.Vectorielle Installation manual Chapter I - page 22
LOCATION OF TERMINAL BLOCKS
10
MO
DE
******
VISO *
VISO **
VEC12
4 FLOORS COLLECTIVE
To the contactors
NOTHING TO BE CONNECTED
K1 connector
To the BG18
floor extension board
board
or
the BG19
2nd automatic door
K1 connector
K12 connector
UP TO 8 FLOORS
To VEC01 board
TOP
BOTTOM
TOP
BOTTOM
KC22 connector
From BG15 board
connector
Serial link
Motor current
measuring device
sonde
Temperature
(Ex : Parameter/
diagnostic tool
Towards
electro-mecanical rail
transformer
Towards power supply
BG17 board
Parameter/
Diagnostic
J1 connector
5 to 16 floors
Extension from
BG18 board
J1 connector
BG19 2nd automatic
door board
Towards the
J1 connecteur
To VEC01 board
J1 connector
OPTION MLIft
To VEC01 board K4 connector,
To BG15 board
J8 connector
Lift controller
connector
Input
Output
Spare
therminal
K28 connector
transformer
Towards power supply
MO
OU1
FE1
COM3
+24
0V
+24
CAM
SPG2
FM
FD
0V
COMB
24R
24R
CREP
0V
24R
24R
SPG4
SPG3
SPG1
0V
0V
+5V
24R
1 3
DE
0V
THV
0V
PH
K25 KP29 KP24
K26
K62KC24KC29K24K23KA14K29K28
2
K13
K15
K30 KC22
K12 K14
+24
0V CAA
CAB
+24
INS/
MAN/
COM1
S
L
COM2
VENT
COM3
FR
+24
0V CAI
CBI
CCS
CCL
0V
MAN
0V
CAA
CAB
MAN
K4
0V
18V
K5
+550VF
0VF
K10
J2
K8
K9
J1
K1
J3
CR
KM17 KC22 KM11 KM12 KC23
24R
DEF
CL
0V
STH
SUSD
CAB
CAA
0V
+24
MTH
0V
GD
GM
MAN
0V
0V
GD
GM
INS
KP26
K27
KA13
KC21
KP21
KP27
KP34
KP23
KS21
KC28
KP22
EPG4
0V
ED
POM
EPG3
EPG2
EPG1
0V
FF1
COI1
FCFE1
FCOU1
+24
SH8
0V
ZONE
PRIC
NS
SU
MHS
DEF
24R
CL
0V
CS1
C3
C2
C1
C0
D3
D2
D1
M0
M3
M2
M1
E/SX
NF3
NF2
NF1
NF0
POS3
POS2
POS1
POS0
KT2
10
8
6
RS
+
-
19 VDC
J2
J7
C3
C2
C1
C0
1
2
C7
C6
C5
C4
P3
P2
P1
P0
P7
P6
P5
P4
3
J5
K30
RS
N70
BG15
J8
VEC01
and to tape head O03.
and from tape head
From BG15 board
O03.
*
**
24 / 48 V
110 / 220 V
!