Installation manual
Série 32 Mlift Vector - Prog.Vectorielle Installation manual Chapter I - page 20
POWER-UP FOR INITIAL MOVEMENT (3/4)
Switch on the power:
− The LEDs showing the transistors are green.
CUT THE SAFETY LANE
Please see page 26 for the description of how to use the frequency drive parameter/diagnostic
communication device
Checking the transistor control:
1) At address 041, write 55
2) At address 041, write 00
041 TEST 55
THE LEDS BECOME RED.
VEC01
RECUP
X2
X1
Y2
Y1
Z2
Z1
041 TEST 00
THE LEDS BECOME GREEN AGAIN.
VEC01
RECUP
X2
X1
Y2
Y1
Z2
Z1