Installation manual
Série 32 Mlift Vector - Prog.Vectorielle Installation manual Chapter I - page 18
MINIMUM CONNECTIONS NECESSARY
FOR INITIAL MOVEMENT (1/4)
7
3
2
0V
STH
GD
GM
0V
0V
INS
GD
GM
Θ
1
68
10
0V
KA16
CS1
KA13
0V
CS2
(BG19)
BG19
BG15
KM11 KM12 KC23
6
8
10
VEC01
+24
0V CAI
CBI
KC22
Bottom
8
VEC05
L1PA L2PA L3PA
FREQUENCY DRIVE TERMINAL RAIL
CONTROLLER TERMINAL RAIL
STATE OF
THE SAFETY LANE
THE 3 LED'S (6, 8, 10)
NEED TO BE LIT UP
BEFORE THE LIFT
WILL MOVE
Green
White
Black
Red
To be installed
in the safety lane
INCREMENTAL ENCODER
HENGSTLER
+24
0V
CAI
CBI
WHITE
GREEN
BLACK
RED
Cut the wires which are not used.
Screening cable do not connect.
Wires CAI and CBI should be crossed
in dependance of your configuration.
encoder
Incremental
5
4
CV
RS
6
FILTRE SECTEUR TRIPHASE
Modèle : 0130-20
20 A à 40°C
3 x 400Vac 50 / 60Hz
Made in France
LINE
LIGNE
AUTINOR
L1'
L2'
L3'
L1
L2
L3
CHARGE
LOAD
FRV1
FRV2
1S
1B
1C
2
2A
3
4
4C
6
8
8A
10
N
L5
Device of bridging of the
safety measures of doors
L3
L2
L1
PE
PE
11
12
13
11
12
13
FUVE
+BR
-BR
Minimum connections necessar
y
for initial movement