Installation manual

Série 32 Mlift Vector - Prog.Vectorielle Installation manual Chapter VII - page 6
WHAT TO KNOW BEFORE STARTING OFF AT FULL SPEED (1/3)
1) To programme the slow down distance on the vectorial frequency drive.
a) Slow down distance including relevelling speed V0.
Example: you have positioned your magnet at 2.5m, during the level height set-up phase
and the controller shows at addresses D0 and D1: 2512.
b) Slow down distance with direct approach.
Segment 5 at address 00E must be ON.
Example: you have positioned your magnet at 2.5m, during the level height set-up phase
and the controller shows at addresses D0 and D1: 2512.
In the controller
Address D0, D1, Ex : 2512mm
In the drive
Address 008, Ex : 2362mm
~ 150mm
Reduce the D0D1 distance by 150mm and
programme this value at address 008 on the
frequency drive.
These 150mm represent the distance travelled
in V0 and the final stopping distance
programmed at addresses D2 and D3. In our
example you should programme 2362 at
address 008 in the frequency drive.
In the controller
Address D0, D1, Ex : 2512mm
In the drive
Address 008, Ex : 2512mm
Programme the same value at address 008 in
the vector drive.