Specifications
10
❖
English
L-2254 Operation
Mechanical Control Panel
(MCP) Operation
Note: Do not turn the unit off and immediately turn it
back on. Wait at least 30 seconds.
Quick Start Operations Checklist
Note: Do not turn the unit off and immediately turn it
back on. Allow at least 30 seconds for refrigerant
pressure equalization.
OPERATION