User's Guide
2 Installing the NAP and the CAP
APCD-LM011-A 13
Use the following procedure to set up a NAP:
1. Ensure that your NAP site has been prepared to support the NAP requirements,
including power, grounding, and lightning protection.
2. Reconnect the Exide 5119 UPS battery. Refer to
Reconnecting the UPS Battery After
Shipping
on page 9.
3. Plug the NAP UPS power cable into a 110 or 220 V AC power source using the
provided cable.
4. Connect the backhaul equipment to a free RJ-45 Ethernet port on the front panel of
the NAP switch. Backhaul equipment must provide transparent Ethernet Layer 2
transport between the NAP and CAP. Refer to
Setting up your Backhaul Equipment
on page 11 for more information.
5. Power up the NAP.