User's Manual
Table Of Contents
- Contents
- Contents v
- Figures ix
- Tables xi
- Preface xv
- Appendix A Specifications 157
- Appendix B Factory Configuration 159
- Appendix C CommandLine Syntax 163
- Appendix D Antenna Guidelines 181
- Appendix E CCU/EUM Data Tables 183
- Appendix F Ping Commands 197
- Appendix G SNMP MIB Definitions 199
- Appendix H Operating Statistics 223
- Appendix I IP Plan — Example 241
- Appendix J Acronyms and Glossary 253
- Index 261
- Figures
- Tables
- Preface
- 1 Introduction
- 2 Quick Startup
- 3 Detailed Description
- 4 IP Network Planning
- 5 Radio Network Planning
- 6 Installation/Diagnostic Tools
- 7 Configuring the CCU
- 7.1 CCU and EUM Serial Number, MAC Address, and Station ID
- 7.2 Setting the CCU Password
- 7.3 Configuring the CCU RF Parameters
- 7.4 Configuring CCU IP Parameters
- 7.5 Configuring DHCP Relay
- 7.6 Configuring Port Filtering
- 7.7 Configuring the SNTP/UTC Time Clock
- 7.8 Configuring SNMP
- 7.9 Adding EUMs to the Authorization Table
- 8 Configuring the EUM
- 9 Installing the EUM
- 9.1 Before you Start the EUM Installation
- 9.2 Other EUM Programming Considerations
- 9.3 Installation Overview
- 9.4 Installation Procedures
- 9.4.1 Opening the Box
- 9.4.2 Turning off the End-user’s Cordless Phones
- 9.4.3 Choosing a Location for the EUM and Antenna
- 9.4.4 Connecting the EUM Components
- 9.4.5 Conducting a Preliminary Check of the EUM
- 9.4.6 Positioning the Antenna
- 9.4.7 Mounting the Antenna
- 9.4.8 Connecting the End-user’s PC
- 9.4.9 Obtaining Valid IP Addresses for the End-user’s PC
- 9.4.10 Testing the Data Link
- 9.4.11 Configuring the Browser Application
- 9.4.12 Completing the Installation
- 9.4.13 Baselining the Installation
- 9.4.14 Troubleshooting
- 10 Maintaining the Network
- 11 Monitoring the Network
- 12 Troubleshooting
- 13 Specialized Applications
- Appendix A Specifications
- Appendix B Factory Configuration
- Appendix C CommandLine Syntax
- Appendix D Antenna Guidelines
- Appendix E CCU/EUM Data Tables
- Appendix F Ping Commands
- Appendix G SNMP MIB Definitions
- MIB-II Elements Supported from RFC-1213
- WaveRider CCU Enterprise MIBs
- CCU Base MIB
- CCU General Information Group
- CCU Radio Configuration Group
- CCU Radio Statistics Group
- CCU Radio General Statistics Group
- CCU Radio Driver Statistics Group
- CCU Radio MAC Statistics Group
- CCU Ethernet Statistics Group
- CCU Modem Information MIB
- CCU Registration Information MIB
- CCU Registration Table
- CCU Authorization Information MIB
- CCU Authorization Table
- CCU RFC MIB-II Traps
- WaveRider EUM Enterprise MIBs
- EUM RFC MIB-II Traps
- Appendix H Operating Statistics
- Appendix I IP Plan — Example
- Appendix J Acronyms and Glossary
- Index

9 Installing the EUM
108 APCD-LM043-4.0
9.4.2 Turning off the End-user’s Cordless Phones
Turn off all cordless phones in the customer’s premises, and any other equipment that uses
the 900MHz ISM band. Once the installation is complete, turn this equipment back on.
9.4.3 Choosing a Location for the EUM and Antenna
The location of the antenna has a significant effect on the performance of the EUM installation.
Before you connect the EUM components, follow the guidelines provided below for choosing
the best location for the antenna and the EUM.
Choosing the Best Location for the EUM
ThebestlocationfortheEUMis
• indoors,
• upright,
• on a stable, flat surface, and
• in a position where its air vents are unobstructed.
NOTE: Avoid placing the EUM in direct sunlight or near other sources of
heat (such as an electric heater).
Choosing the Best Location for the Antenna
The best location for the antenna is
• indoors,
• near an outside entrance or window, preferably in the location with the best
possible path to the CCU, and
• a minimum of 20cm (8in.) from personnel.
9.4.4 Connecting the EUM Components
Now that you have chosen a suitable location, use the instructions in this section for
connecting the following components to the EUM, in the order shown in Figure 38:
• Antenna
• EUM AC/DC adaptor (DC cable first, then AC cable)