User's Manual
Table Of Contents
- Copyright
- Software License Agreement
- Warranty
- Contents
- Figures
- Tables
- Preface
- 1 Introduction
- 2 MDB1000
- 3 Setup Menu
- 4 Installation
- Appendix A Factory Configuration
- Appendix B Ethernet Cables and Connectors
- Index
22 APCD-LM048-1.3
4: Installation
Table 4 Installation Stage Checklist
Once the installation is complete and verified, the network operator can complete the Post-
installation Stage, using the Automatic Remote Configuration feature or manually over the air.
This is discussed in section 4.4, Post-Installation
Step Discussion
section 4.3.1, Locating the
EUM3006
Find the best location for mounting the EUM3006, with a
good RF signal and at least 1 foot away from where
people will stand.
section 4.3.2, Mounting the
EUM3006
The EUM3006 mounts to a vertical pole with a diameter
between 1 and 3.0 inches. Once a location with good
signal levels is found, attach pole mounting hardware
such as a standard Satellite TV mount, to the building or
support structure. Attach the EUM3006 to the pole with
the mounting plate and the two gear clamps.
section 4.3.3, Running
Cables
Run the Ethernet cable from the modem to the PoE
Injector and run the grounding conductor to a suitable
grounding location.
section 4.3.4, Provide
Power to the EUM3006
Connect the modem to a power source, usually the PoE
injector provided.
section 4.3.5, Connecting
the End-User’s PC
Connect the modem to the end-user’s PC.
section 4.3.6, Testing the
Data Link
Confirm that the link is functioning correctly.