Technical data
VAXserver 4000-200 Conversion
4.3 Before Installing the Kit
4.3 Before Installing the Kit
Before installing the kit:
1. Have the customer back up the system software before the Digital Services
representative arrives. It is the customer’s responsibility to back up the
system software.
2. Turn on the system power and run diagnostics to verify system operation.
3. Turn off the system power before installing the kit.
4.4 Installing the Kit
To install the conversion kit:
1. On a BA215 system, turn the front panel key switch to the bottom position
and remove the front panel as described in Chapter 1. Turn off the system
power switch to the BA215 system.
2. On a BA430 system, unlock the front door by turning the front door key
switch to the bottom position. Swing open both access doors, and turn off
the power switch to the BA430 system.
3. Turn off the system power to any expander boxes connected to the system.
VAXserver 4000-200 Conversion 4–3










