Technical data
1.15.3 Configuration Guidelines .......................... 1–27
1.15.4 Module Order and Configuration .................... 1–28
1.15.5 Configuration Worksheets . . . ...................... 1–28
Chapter 2 Installation
2.1 Site Preparation Considerations ...................... 2–1
2.1.1 BA430/BA440 Physical Dimensions .................. 2–1
2.1.2 Additional Equipment ............................ 2–2
2.1.3 Static Electricity . . .............................. 2–2
2.1.4 Acoustics ...................................... 2–3
2.1.5 Heat Dissipation . . .............................. 2–3
2.1.6 Temperature and Humidity Values .................. 2–3
2.1.7 Electrical Requirements ........................... 2–4
2.2 Unpacking the Shipment ............................ 2–5
2.3 Connecting the Console Terminal...................... 2–6
2.4 Completing the Installation .......................... 2–7
2.4.1 Setting Controls on the System ..................... 2–11
2.4.5 Connecting the Power Cord . . ...................... 2–11
2.4.3 Installing RF- and RZ-Series ISEs ................... 2–12
2.4.3.1 Inserting Bus Node ID Plugs ..................... 2–13
2.4.3.2 Labeling RF-Series ISEs for Systems with Multiple
DSSI Busses . . . .............................. 2–15
2.4.8 Installing a TLZ04 Tape Drive ...................... 2–16
2.5.8.1 Inserting the TLZ04 Bus Node ID Plug ............. 2–17
2.6 Installing RF- and RZ-Series ISEs ..................... 2–18
2.5.1 Inserting Bus Node ID Plugs . ...................... 2–21
2.5.2 Labeling RF-Series ISEs .......................... 2–22
2.6 Installing a TL-Series Tape Drive ..................... 2–23
Chapter 3 BA430/BA440 FRU Removal and Replacement
3.1 Field Replaceable Units (FRUs) . ...................... 3–2
3.2 Installing and Removing Modules ..................... 3–3
3.2.1 Removing Modules with Ratchet Ejector Handles . . ..... 3–4
3.2.2 Removing Modules with Attached Handles ............ 3–5
3.2.3 Removing Modules with Covers ..................... 3–5
iv