Installation guide
Installation Overview 1-3
In general, the procedure is as follows (Figure 1-1):
1. Unpack and assemble all cabinets as described in Chapter 2.
2. Connect the console, and, if appropriate, make the Ethernet and FDDI
connections as described in Chapter 3.
3. If connecting to a DSSI subsystem (VAX 10000 systems only), refer to
Chapter 4 for installation instructions and to Appendix A and Appen-
dix B for background information.
4. If connecting to a CI VMScluster, refer to Chapter 5 for installation in-
structions.
5. Power up the system as described in Chapter 6.
6. Observe and consider the results of the system self-test as described in
Chapter 7.
7. Verify system operation by running various diagnostics and utilities as
described in Chapter 8.










