Installation guide
Installing the System Cabinet 2-5
Review requirements such as power, environmental, and space require-
ments for the system.
NOTE: Since the cabinet is heavy and has a high center of gravity, remov-
ing it from the pallet requires at least two people.
If the system also includes an expander cabinet, you will additionally need
the tools listed in Table 2-2 during installation.
Table 2-2 Expander Cabinet Tools
Tool Use
Large Phillips screwdriver
To remove and install screws and to re-
move the 1/4 turn skirt fasteners
Flathead screwdriver
For installation of IOP cable(s)
For more information:
Site Preparation Guide










