6.1 Verification Overview
To verify the new processors, turn the system on and let
self-test run. Set system parameters. Apply current ROM
patches with EVUCA. For systems with vector processors,
run the VAX Vector Instruction Exerciser. Then save system
parameters, boot the operating system, and run applicable
tests.
Figure 6–1: Verification Flowchart
Run EVUCA to Apply
Current ROM Patches
1
Power-Up System.
Self-Test Runs.
Set System
Serial Number
and Parameters
2
4
5
3
msb-0608D-90
Verify System Under
Operating System
6
Vector
Processor in
System
Yes
No
Run the VAX Vector
Instruction Exerciser
See Sections 6.2 and 6.3
See Section 6.4
See Sections 6.7 and 6.8
See Section 6.5
See Section 6.6
See Section 6.9
Save
System Parameters
6–2 VAX 6000: Installing Model 500 Processors