Installation guide

2.2 Collect Tools and Resources
You will need the items listed in Table 2–1 to unpack and
install the system cabinet. The removal of the cabinet from
the pallet requires at least two people.
Table 2–1: Tools and Resources
Item Use
Packing slip To verify that all hardware has been delivered
Digital voltmeter To verify power requirements at installation site
7/16 inch wrench To remove shipping carton brackets
9/16 inch wrench To remove pallet brackets and to lower leveler feet
Level To verify that the cabinet is properly leveled
2–4 VAX 6000 Series Installation Guide