Installation guide
SHOW CONFIGURATION
command, 8–6
Single-host, 3–7, 3–18 to 3–19
Split-bus, 3–9, 3–15, 3–17
System I/O panel
Ethernet port, 2–15
FDDI port, 2–17
System parameters, record, 8–24
System verification, 8–2 to 8–27
T
Terminal
cabling, 2–13
setting console parameters, 2–13
Termination
on-board, 3–11
removable, 3–11
TF857 tape loader, 3–17
TF tape drive, 8–3
Through-bus, 3–9, 3–15, 3–17
TK tape drive, 8–3
Tools
for expander cabinet installation,
2–5
for system cabinet installation,
2–4
Transformer, 6–4
Tri-host, 3–7, 3–9, 3–20 to 3–21
software requirements, 3–21
U
UETP (User Environment Test
Package), 8–26 to 8–27
Unpacking system cabinet, 2–1 to
2–11
checking for damage, 2–11
removing cabinet from pallet,
2–11
tools required, 2–4
V
VAXBI card cage
node numbers, 7–5
VAXBI card cage (Cont.)
slot numbers, 7–4
VAXBI expander cabinet
installation, C–1 to C–10
VAXBI modules
self-test, 7–7
VAXcluster, 4–1 to 4–25
BNCIA cabling, 4–24
cabling to an SC008, 4–25
CIBCA jumper locations and
settings, 4–22
installing jumpers, 4–20
port, 4–24
setting a node address, 4–20
VAXcluster options, 3–4
VAX Diagnostic Supervisor, 3–30,
3–32 to 3–33, 3–41, 8–12,
8–13, 8–14, 8–18, 8–19
file names, 3–33
Verification, 8–2 to 8–27
Voltages, measuring, 6–7
X
XBI
self-test results, 7–7
XMI card cage
node numbers, 7–5
slot numbers, 7–4
XMI-to-VAXBI adapter
cables, C–1
self-test results, 7–7
Index–4










