Installation guide
D
DEBNA adapter, 3–5
DEBNI adpater, 3–5
DEC power bus cable, C–8
DELTA time, 4–10
DEMFA adapter, 3–5
DEMNA adapter, 3–5
Diagnostic CD-ROM, 8–3
Diagnostic LEDs on H7206-B, 6–8
Diagnostic monitor, 8–11
Diagnostic TF tape, 8–3
Diagnostic TK tape, 8–3
Digital Storage System Interconnect.
See DSSI
Disable arbitration, 4–14
DSSI, 3–1 to 3–41
buses, 3–11
bus limitations, 3–13
cable kits, 3–23
cables, 3–22 to 3–23, 3–26 to
3–27
compared with CI, 3–6 to 3–7
configuration, 3–12
description, 3–6
documentation, 3–2
install manuals, 3–2
install overview, 3–2
DSSI subsystem
configuration, 3–24 to 3–25
configuration procedure, 3–25
configuration sheet, 3–25
Dual-host, 3–7, 3–8, 3–20 to 3–21
software requirements, 3–21
DWMBB, C–8
cable connections, C–8
cabling rules, C–10
installing module, C–6 to C–8
E
EEPROM
saving parameters, 8–25
setting parameters, 8–25
ELKMP (multiprocessor test), 8–21
Embedded storage, 3–19
Environmental requirements, 1–4
to 1–6
altitude, 1–6
relative humidity, 1–6
temperature, 1–6
Equipment damage, 2–3
ERKMP (multiprocessor test), 8–21
Ethernet transceiver cables, 2–15
Ethernet verification, 8–8
EVCXF, 3–36 to 3–37
EVCXF diagnostic, 3–11, 3–25, 3–30
to 3–41
EVSBA (standalone autosizer), 3–34
to 3–35, 8–21
Expander cabinet, C–1 to C–10
Extend ACK timeout, 4–14
Extend header, 4–14
External loopback testing, 8–9
F
FDDI cables, 2–17
Floor space required, 1–4
H
H405 AC power controller
main circuit breaker, 6–3
H7206-B diagnostic LEDs, 6–8
H9643 cabinet, 5–4
50 Hz transformer, 6–4
I
InfoServer, 8–3
Installation
DSSI overview, 3–2 to 3–3
Integrated storage element. See ISE
ISE, 3–1, 3–8, 3–12 to 3–13
controllers, 3–13
self-tests, 3–11
K
KDB50 adapter, 5–6
Index–2










