Instruction manual
43
High Throughput Diffusion Pumps
DRAFT 12/23/04
To reassemble the jet:
1. If the center jet rod was removed or loosened during
disassembly, thread the rod back into the boilerplate.
The top of the rod should be roughly 1/16" to 1/8"
below the top surface of the inlet flange (inlet plane
of the pump). Once properly located, use the nut
near the boilerplate to lock the rod in place.
2. Reassemble the lower stages by stacking them
(outside the pump body).
3. Lower the second stage and fractionating tube into
the lower jet assembly, aligning the two slots on the
tube with the frame of the jet base. Ensure that the
slots are engaged by attempting to rotate it.
4. Install the second stage jet shield.
5. Install the tie rods through the two holes in the cross
member and thread them into the frame on the jet
base.
6. Thread the two nuts on the tie rods. The height of the
tie rods should be adjusted as needed by threading
them into the frame of the jet base such that the rods
extend above the nuts by roughly 1/8".
7. Using the cross member and the appropriate lifting
equipment, lower the entire jet assembly into the
pump body, over the center jet rod.
8. Reverse steps 1 through 3 above to reassemble the
upper jet components.
CAUTION Do not over tighten the nuts on the tie
rods. Doing so will distort the cross
member,. The rods are meant to hold
the assembly together during
installation in the pump.
CAUTION If the pump has been equipped with a
thermowell near the bottom of the
pump body, there is a corresponding
slot in the jet base for clearance around
the thermowell. Ensure that the slot
engages the thermowell to avoid
damage to the thermowell and jet.
NOTE The hex nut is installed such that the
small diameter acts to center the cold
cap or halo baffle. Ensure that the hex
nut is not installed upside down.










