User`s manual
MENU SYSTEM : SELF TESTS
4
02.9673.0001 D 02-May-03 65
Self Tests
Running Parameter Tests
The luminaire is capable of running self tests by using the TEST menu functions. For complete
details and values for each test refer to “Diagnostic Tests” on page 67.
Note: After 10 seconds of inactivity, the menu display will change to the default state showing the
address.
When running tests on multiple luminaires, a loopback connector is required at the master luminaire
(first in link) and a male termination connector is required at the last luminaire in the link. (Refer to
page 14 for more information regarding the construction of these connectors.)
Figure 4-5: Test Setup
To run tests:
Step 1. Press [Menu].
Step 2. Press [Up] / [Down] arrows until Test appears. Press [Enter].
Step 3. Use [Up] / [Down] arrows to select a parameter to test. Refer to “Menu System Functions”
on page 53 for a complete list of test parameters which can be chosen.
Step 4. Press [Enter] to run test.
Step 5. Press [Menu] to stop test at any time.
Termination Connector
Data Thru Data Thru
Master luminaire containing
software version to download
Luminaire 1
requiring update
Luminaire 2
requiring update
Loopback Connector