Instruction manual

Varec, Inc. 71
7532 Radar Tank Gauge
7.4 Mounting Calibration with the Varec Operating Program
To carry out the mounting calibration with the operating program, proceed as follows:
Start the operating program and establish a connection.
Select the “mounting calibr.” function group in the navigation bar.
The following display appears on the screen:
Mounting calibration step 1/2:
auto correction
pipe dam. corr.
Figure 7-18: 7500 Series Radar Tank Gauges - Mounting Calibration (Step 1/2)
Note Each parameter that is changed must be confirmed with the RETURN key! The
“Next” button moves you to the next screen display: