Instruction manual
Varec, Inc. 43
7532 Radar Tank Gauge
7 Commissioning
7.1 Function Check
Make sure that all final checks have been completed before you start up your measuring
point:,
• Checklist “Post-installation Check” on page 23.
• Checklist “Post-connection Check” on page 30.
7.2 Switching on the Measuring Device
When the device is switched on for the first time, the following messages appear in a
sequence of 5s on the display: software version, communication protocol, and language
selection.
Select the language
(this message appears the first time the
device is switched on)
Select the basic unit
(this message appears the first time the
device is switched on)
The current measured value is displayed
After is pressed, you reach the group
selection
This selection enables you to perform the
basic setup
E
+
–
E