Instruction manual

7532 Radar Tank Gauge
Varec, Inc. 23
Figure 4-11: Preparation for the Installation of the Varec UNi Flange, cont’d
4.5 Post-installation Check
After the measuring device has been installed, perform the following checks:
Is the measuring device damaged (visual check)?
Does the measuring device correspond to the measuring point specifications such as
process temperature/pressure, ambient temperature, measuring range, etc.?
Is the flange marking correctly aligned (see “Quick Installation Guide” on page 11)?
Have the flange screws been tightened up with the respective tightening torque?
Are the measuring point number and labeling correct (visual check)?
Is the measuring device adequately protected against rain and direct sunlight (see
“Accessories” on page 75)?
9
Ø 78
17
16
detail A
flange hub for the connection
to flanges provided by the customer
flange hub
O-Ring 85.3 x 3.53,
included
(same material as
sensor seal)
mounting:
4 bolts M6 / 90°
e.g. DIN 912
Varec’s UNI ange
(max. 1 bar)
detail A:
flange adapter
(see under)
mount Varec’s UNI flange
pull off housing
Ø 62.5
Ø 99.5