Installation manual

System Operation Description
5-13
Copyright
2001 Phone: (614) 771-271 RE-4500
Vanner Inc. FAX: 614-771-4904 Installation Manual
4282 Reynolds Dr. www.vanner.com Rev 10d
Hilliard Ohio 43026 RE Owners_Manual_Rev10d D99988
INCORPORATED
INCORPORATEDINCORPORATED
INCORPORATED
Bypass
If Charging, Grid-tie, and Inverting are enabled, and if a valid
AC source is present, then the transfer relay will be set after the
generator delay so that AC power flows to the output from the
Grid. If the Grid goes away, Inverting will immediately start.
In this mode, the Inverter acts to backup the utility. User
settings on voltage and frequency are used.
If Charging, Grid-tie, and Inverting are disabled and if a valid
AC source is present, then the transfer relay will be set after the
generator delay so that AC power flows to the output from the
Grid. If the load current goes above the maximum setting, the
relay will open. User settings on voltage, maximum current,
and frequency are used.
System Control
This section describes the Control of the RE-4500. The
controls consist of an On/Off switch and the Inverter/Charger
Controller (RE-ICC).
On/Off Switch
The On/Off switch located on the front panel, turns on and off
the internal logic power supply. This switch also when placed
in the “Off” position resets the system.
Warning
It should be noted that dangerous voltages are still present inside
the RE-4500.
Disconnect all DC and AC Power Sources from the RE-4500 before
attempting any service of the unit.
There are no User Serviceable Components inside the RE-4500!!