Shower Door 1/4" glass (6mm) CAUTION: To reduce the risk of breakage, keep corner protectors on glass while installing. Keep corner protectors for use in case future adjustments are needed. Consult your local plumbing codes prior to installation. MODEL: Recommended Clearance Heights for Installation: 21126070MBO6NP 58 inches (147.3 cm). 70 inches (177.8 cm) 21126070CHO6NP 21125470MBO6NP Recommended Width for Installation: 21125470CHO6NP 60-inch enclosure: 21124870MBO6NP 58 60 inches (147.3152.
( Drill Bits ) ( Screw Driver ) ( Drill ) Level h © NN (3mm) dia. HSS = RN VAN J J ( Silicone (Measuring Tape) ( Soft Head ) Pencil ) Hammer (Knife Sealant | (MASONRY DRILL) ( Safety Glasses ) BIT FOR TILE SN @6mm NG / J ARN J ( Glove h (Carpenter's Squarer) (Masking or painter's Hack Saw tape Metal File ” CAUTION: When cutting or drilling metal components or when handling glass, to reduce the risk of personal injury, protective eye wear, gloves, and closed-toe shoes are required.
CAUTION Please carefully read the following important safety information before handling or installing this shower. There is a risk of serious injury while handling this product. To minimize these risks, please note: » Always wear safety glasses and gloves while handling. » Always follow the installation instructions. * Inspect glass for damage before installation.
PART# DESCRIPTION QTY A Bottom threshold cap (R)| 1 B Bottom Rail 1 C1 Inside Door panel 1 C2 Outside Door panel 1 D Bottom threshold cap (L)| 1 E Wall Jamb 2 F Towel Bar 2 PART# DESCRIPTION QTY G Upper Guide Rail 1 H PVC seal 4 I Upper guide rail lock(L) 2 J Upper guide rail lock(R) 2 K Roller set (L) 2 L Roller set (R) 2
Roller set 0 aa © Screw cap 7 pcs -— J 0 Washer ®10XD5X1.0 9 pcs Towel Bar Roller set ST4X30mm 7 pcs Sy Plastic tube O8XP6.2X5 9 pcs cc AS © Wall anchor Screw 26x28mm M5X12mm 7 pcs 9 pcs bh Additional spare parts are included.
Model Specific Preparation Verify threshold and wall with a level. 1/4” (6mm) Out-of-Plumb Adjustment within the Wall Profile. | Threshold must be level.
Measure the finished opening width. 1.Measure the finished opening width at the bottom and at the model height. Use these dimensions as “W1” (top) and in step #2.
Cut the Upper Guide Rail (G) and the Bottom Rail (B) to fit your finished opening using either a miter saw or a hacksaw Cut the Upper Guide Rail (M) to: “W1” (top) dimension 1/16" A ~ Upper Guide Rail Cut the Bottom Rail (B) to: “W2" (bottom) dimension 9/16" Use a metal file to remove any burrs from the cut ends.
Bottom Rail(B) Installation 1.Apply silicone into the groove along the entire length of the Bottom Rail(B) as Fig a: 2.Measure in 5/16" from the outside of the Bottom Rail(B) as Fig.b. = Fig.b ] 8mm [5/16" \ Use Painter's Tape to hold the Water seal tight in position while the silicone cures.
Wall Jamb(E) Installation 1.Attach the Cap(A & D) to Wall Jamb(E) as Fig.a; 2.Attach the Wall Jamb(E) to Bottom Rail(B) as Fig.b; 3.Please note one end with 2 side holes faces up.Mark the location of the holes as Fig.c; 4 Drill the holes as Fig.d; stud is presented behind the wall: drill a pilot hole into the stud and use the ST4.0 x 30mm Screws (bb) Fig.a Fig.b e If no stud is presented behind the wall. TS, o> drill a hole and insert the Wall Anchors ® 0 ° (cc) and use the ST4.0 x 30mm Screws (bb).
Wall Jamb(E) Installation 1.If necessary insert the Wall Anchors (cc) as Fig.e; 2.Apply silicone into the groove along the entire length of the Wall Jamb(E) as Fig f; 3.
The Installation on the Inside Door Panel (C1) Can Y The faces inside. foe; \1. Insert the Plastic Tube(ff) in to Door Panel (C1); 2. Use Screws (dd) and Washer) attach the Roller Set The anon grass label faces inside.
Upper Guide Rail (M) Installation place before install the Upper Guide Rail(M), and the green label faces outside. fore Put Inside Glass Paneling) inside the shower The ANON GLASS label faces inside; The Roller faces inside. Insert the Upper Guide Rail(M) into the ANON GLASS installed Wall Jamb(E). Check the Upper Guide .| Rail for level.
The Installation on the Outside Door Panel (C2) ~Y cn The faces Outside. Insert the Plastic Tube(ff) in to Door Panel (C2); 2. Use the Screws (dd) and Washer) attach the Roller Set (K&L) . The anon grass ~~ / NON Te ™ label faces inside. oN ANON GLASS holes on 3 $0 the top! wo SEX \ K X1 Rollers 14
Outside Door paneling) Installation INANE GLASS ~ The anon grass label faces inside. A 7 Inside Outside Fig.d 7 1 2 Fig.e 1. Move the bottom guide slider of the fo lower Door pane novas Door panel | | Bottom Rail(B) to the side as Fig.a; 2.Insert the Outside Door Paneling) into the Upper Guide Rail(M) as Fig.b and Fig.c . DO NOT install the towel bars on the glass until instructed. DO NOT lift the glass using the towel bars; 1.
Inside Door paneling) Installation ANON GLASS ~. ~ ~ The anon grass label faces inside. <_ Inside Outside Fig.e 1. Move the bottom guide slider to the Raise Roller Wheel Lower Roller Wheel lower Door panel to raise Door panel middle as Fig a, 2.Insert the Inside Door Panel into the Upper Guide Rail(M) as Fig.b and Fig.c; DO NOT install the towel bars on the glass until instructed. DO NOT lift the glass using the towel bars; 1.
Towel Bar (F) Installation r ~ Attach the Towel Bar (F) to the Door . Be sure to use all of the supplied rubber gaskets to protect the glass.
Attach the PVC Seal(H) to Door ( 2 pieces on each door. 1.Attach the PVC Seal(H) to Door No _ ~ 2.
Attach the Lock(l & J) to Upper guide rail(M) . Put one lock into the track of the Upper Guide rail(M) , fore and then move the lock to the side until the tab of the lock goes inside the hole of the Wall Jamb(E). Repeat this installation to install all 4 locks as Fig.
SEALING ~ The surfaces need to be clean and free of debris before applying sins. | \ha Ensure that the Shower door closes tightly and opens smoothly. Apply a good quality silicone sealant along the wall Jamb(E) and Bottom Rail(B) . \~~ Allow 24 hours for the silicone to cure before using the shower. ) NN Apply Silicone Sealant, (not supplied). Apply silicone around the bottom rail. Use Painter's Tape to hold the Water seal tight in position while the silicone cures.