Instructions / Assembly

INSTALLATION PROCESS
X4
(According to actual needs)
X4
(According to actual needs)
X1
(Z-bar)
Warning: Always switch off the
electrical supply at the mains during
installation and maintenance.
Do not switch on the electrical
supply at the mains until the end of
the installation.
Step 1:
Use an I-Beam level to mount the included
mounting bracket with 3 screws (Use anchor when
it's installed on drywall, concrete or tile surface).
Step 2:
Make sure the circuit breaker for the power source
of the mirror is off. Then connect the neutral
(White), hot (black) and ground (copper wire or
Green) wire between the mirror and the junction
box.
Step 3:
Hang the mirror with desired placement by mirror
Z-bar on to the mounting bracket.