1. Install the cable (1) into the small slot and through the larger slot in the drum for the hook load line.
a. Make sure that 2 to 4 threads of capscrew (2) are engaged into the cable anchor assembly (4). Start with the
capscrew and insert the cable anchor assembly into the longer slot as far as allowed.
b. Make sure that the lip of retainer (3) faces the top edge (5) of the small slot in order to hold the retainer in
place. Make a loop with the cable end and insert the cable end into the slot past the cable anchor assembly.
c. Pull the cable until the cable and anchor assembly are securely seated inside the slot. Tighten the capscrew to a
torque (6) of 44 ± 3 Nm (32 ± 2 lb ft).
2. Wind one half of the cable evenly across the load drum (7).
Figure 42: Installing hook load line
(A) Wire rope from the winch.
3. Install the hook load line from the winch drum onto the sheave blocks in the following manner:
a. Install the cable for the hook winch from the winch drum to fairlead sheave (8).
Note: The cable for the hook winch should go over upper sheave (9) which is toward the front of the machine. Anchor the
cable for the hook winch toward the rear of the machine.
b. Install the cable over upper sheave (9).
c. Install the cable under lower sheave (10).
d. Install the cable over upper sheave (11).
e. Install the cable under lower sheave (12).
f. Insert the cable into the pocket and around wedge (13). Allow an additional length of cable to form a tail end
(six inch minimum). Use a mallet to tap the wedge and the wire rope into the pocket.
g. Insert the tail end of the wire rope through clamp (14). Add a short piece of wire rope through clamp (14) in
order to secure the clamp, as needed. Tighten the nuts on the clamp.
Hook
block
Load
block