Specifications

046-08OP-001D S/N 046050010021 - UP
25
7. To remove load block and hook block from stowing-link, reverse the above steps, and ensure the stowing-link is
placed firmly back into the slot in bumper.
8. Lower the boom to the horizontal position onto wood blocks that are sufficient to support the boom.
9. Remove the cotter pin, the retainer, and pin (2). The approximate weight of the luff block is 76 kg (168 lb).
10. Replace the pin and the retainer (2) in the boom.
11. Move the luff block clear of the boom and area; it will be secured after the boom has been removed.
Figure 28: Location of pins for removal of boom
12. Fasten an appropriate lifting device to the boom. The approximate weight of the boom is 936 kg ( 2064 lb).
13. Remove the cotter pins, the retainers, and the pins (8) from both sides of the support.
14. Remove the boom from the machine. Replace the pins in the support.
Figure 29: Location of Luff Block stowing point and stowing pin (9)
15. Draw in the line for the boom and fasten the luff block to the machine at the luff block stowing point on the track
frame for shipping using stowing-pin (9).
16. Draw in the excess line for the boom, ensuring not to over tighten the cables to avoid causing kinks.
8 8
035-05-05-001
9
035-05-30-019A