Owner's Manual
MOUNTING
VAIL
CAST
INTO
THE
WALL
1)
PLACE
THE
2 GANG
RING
INTO
THE
CHOSEN
LOCATION
ON
THE
WALL
BY
CUTTING
THE
DRYWALL.
PLEASE
BE
SURE
THE
AREA
IS
FREE
OF
OBSTRUCTIONS
AND
YOU
CAN
RUN
WIRES
FROM
THE
LOCATION
TO
SPEAKERS,
POWER
SUPPLY
AND
OTHER
CONNECTIONS.
2)
LOCATE
THE
TWO
SCREWS
AT
THE
BACK
OF
THE
VAIL
CAST.
YOU
WILL
BE
REMOVING
THESE
SCREWS
AND
THE
RESECURING
THEM
WITH
THE
VAIL
CAST
BRACKET
IN
PLACE.
···········-·
• 0
-- --
- ·
____
_
._
---
--
.....
·.·
.-.
·.·.
"'"":
.·.·.·
.
·.·
Remove & Save
for
Mounting
of
Bracket
Place Bracket onto the VAIL CAST
so
that the bottom holes align
with the screw holes and resecure the screws
in
place
3)
WITH
THE
BOTTOM
TABS
SECURED
LOCATE
THE
OPENINGS
AT
THE
TOP
OF
THE
VAIL
CAST
THAT
ALIGN
WITH
THE
UPPER
TABS.
YOU
WILL
SCREW
THE
TABS
INTO
PLACE
WITH
THE
TWO
PROVIDED
SCREWS.
4)
YOU
CAN
NOW
SLIDE
THE
ASSEMBLY
OF
THE
VAIL
CAST
AND
BRACKET
INTO
THE
2 GANG MOUNTING
RING
YOU
HAVE
INSTALLED.
BE
SURE
TO
MAKE
ALL
CONNECTIONS
TO
THE
BACK
OF
THE
VAIL
CAST
FIRST.
ONCE
IT
IS
IN
PLACE
IT
SHOULD
ALIGN
WITH
THE
SCREW
HOLES
ON
THE
LOW
VOLTAGE
RING.
USE
THE
REMAINING 4
SCREWS
TO
SECURE
THE
BRACKET
TO
THE
RING. DO NOT
OVERTIGHTENED
AS
THIS
MAY
CAUSE
ALIGNMENT
ISSUES
WITH
THE
SCREWLESS
PLATE.
ONCE
THE
SCREWS
ARE
IN
PLACE
SNAP
THE
SCREW-LESS
PLATE
INTO
PLACE.
IF
YOU
WISH
TO
KEEP
THE
VAIL
CAST
CLEAN
DURING ANY
REMAINING CONSTRUCTION WORK
YOU
CAN
LEAVE
THE
PLASTIC
FILM
ATTACHED
TO
THE
PLATE
IN
PLACE.
THIS
WILL
KEEP
THE
VAIL
CAST
AND
PLATE
CLEAN.
Phone :
{866)
834-6321
Email:
info@vanguarddynamics.com
1299
Columbia Ave
E6,
Riverside,
CA
92507
www.vanguarddynamics.com