Owner`s manual
Table Of Contents
- Safety and Warning Information
- Specifications
- Dimensions and Clearances
- Venting
- Existing Fireplace Preparation
- Supply Gas
- Vent Liner Rough-In
- Appliance Preparation
- Firebox Installation
- Ceramic Fuel Bed Installation
- Window Refitting
- Operation Check and Aeration Adjustment
- Remote Control Installation
- Cast Iron Fret Installation
- Vent Check
- Owner’s Information
- Remote Control Operation
- Options
- Lighting Instructions
- Warranty
- Parts

14
Place R/H Cross Log
Onto Locating Pins
L/H Log Locating Pins
Place Middle Cross Log
Across Gap in Front Log
Place L/H Cross Log
Onto Locating Pins
Hook the window over the top edge of the rebox and
fasten the bottom two spring-loaded bolts by pushing in
and turning 90 degrees.
If broken, the glass pane may only be replaced as a
complete window assembly unit as supplied by the
manufacturer.
Cast Iron Fret Installation
Spring-loaded
Fastening Studs (2)
1/4 Turn
Ceramic Fuel Bed Installation
Window Retting