Operating instructions

2525
4. The underside of each ceramic rock is identi-
ed by a number and a speci c protruding
positioning triangle.
Install the six rocks from left to right starting
with rock no. 1.
Note: The ceramic base may need to be slightly
adjusted side-to-side to allow stones to t within
the platform.
5. Place the glass panel in its cavity formed by the
Front Support and the Ceramic Platform.
6. Place the left twig across the
second and third rocks from the
left; rest its end on the glass
near the edge of the platform as shown. Make
sure to leave a gap between the twig and the
rst rock to allow ame to come up between
the twig and the rock.
7. Place the right twig across the
second and third rocks from the
right; rest its end on the glass
about 1 cm from the edge of the
platform as shown. Make sure to leave a gap
between the twig and the rst rock to allow
ame to come up between the twig and the
rock.
Ceramic Rocks installation
All Rocks Installed
Rock
identi cation
Triangular
hole in
ceramic
base