Unit installation

3. Hold coal ‘B’ upright with
the arrow pointing to the top.
Locate coal ‘B’ as shown in
figure 18.
4. Hold coal ‘C’ upright with
the arrow pointing to the top.
Locate coal ‘C’ as shown in
figure 19.
5. Hold coal ‘D’ upright with
the arrow pointing to the top.
Locate coal ‘D’ as shown in
figure 20.
6. Hold coal ‘E’ upright with
the arrow pointing to the top.
Locate coal ‘E’ as shown in
figure 21.
Page 24
INSTALLER GUIDE
Figure 21.
Figure 20.
Figure 19.
Figure 18.