Unit installation

6. UNPACKING AND PRELIMINARY CHECKS
6.1 Unpacking.
1 Main fire assembly with fascia.
1 Ceramic fuel effect (Packed in the fire).
1 Nut & olive for 8mm inlet pipe.
1 Fire front / fire front casting set.
1 Flue unit.
1 Wall fixing template.
2 Fire retaining cables.
2 Eyebolts.
2 Fibre wall plugs.
2 No 6 self tapping screws.
8 Woodscrews.
8 Plastic wall plugs.
1 Length of flue sealing tape.
1 Literature pack.
1 Terminal guard (supplied flat).
INSTALLER GUIDE
Figure 6.
© Baxi Heating U.K. Limited 2009.
Page 17










