User's Manual

88
Enclosures Constructed Using Combustible Materials
(ZC Installations)
Optional 975ZCK Zero Clearance Kit must be used when installing the 922
replace into any application other than as an insert into an approved solid-
fuel burning replace cavity and chimney. Complete installation instructions
are packed with the 975ZCK. See gure below for clearances in front of
appliance. The 975ZCK is approved for installation directly on combustible
type ooring such as plywood. Bottom of 975 must be installed at top of
nished hearth (including tile etc.) or the removable ashpan cover will not
rest at the proper height. Cast iron fronts must also rest on a secure hearth
or oor as the unit is not intended to carry the weight of the castings. The
975ZCK may be roughed-in, wall nishes applied, and the replace installed
at a later date or the replace and ZC kit may be installed at the same time.
975ZCK Assembled
975ZCK Components
Framing dimensions
975ZCK installed into framing
975ZCK Wall nish details