User`s guide
USER'S GUIDE____________________________________________________________________ 
8.  Set the probe into the sample cell. Tighten the probe by turning 
it from the thread nut. Do not tighten the probe from the handle. 
9.  If the sample cell is installed correctly, there is no leakage in the 
connections. You can test this by closing the valve temporarily. 
CAUTION 
By using the quick connector, the process pressure can be maintained 
during the installation or removal of the sampling cell. Take a firm 
hold of the device to keep it in your hands while removing it. When 
the thread adapters are used, the process pressure has to be shut down 
for the installation or removal of the probe. 
DSS70A Sampling System 
DSS70A is a sampling system for taking gas samples from hot, dirty, 
or pressurized processes. The gas collecting system is built in the 
briefcase including the DM70 meter. The system consists of a sample 
pump that draws out the sample gas, a filter to clean the sample from 
particles 
(> 7µm), and a sample valve and flowmeter to adjust the flow rate. 
Sample Gas
Inlet
Sample Gas
Outlet
Sample Pump
FlowmeterSample valve
Sample Cell
for Td Probe
Filter
The sample gas going into the system must meet the following 
requirements: 
-  The temperature must be <40 ˚C (104 ˚F). Thus, when using 
the FEP tube of 2 meters (provided), the temperature of the 
process gas should be less than 200 ˚C (392 ˚F). When the 
temperature of the sample gas is over 200 ˚C, a stainless steel 
tube (not provided) should be used. 
-  The sample gases must be: Air, N
2
, non-toxic gases, inert, 
non-flammable gases. 
-  If the sample is taken from a pressurized process (1.2 ... 20 
bar), the sample pump must be turned off and the tube from 
the flowmeter to the pump must be detached. 
54 __________________________________________________________________ M010091EN-F 










