Technical data

9 Commissioning
28
9 Commissioning
9.1 Filling Secondary D.H.W. Circuit
Note:
Do not manually open the temperature and pres-
sure relief valve or expansion relief valve for
venting purposes (any foreign matter in the
pipework may cause damage to the valve seats).
Ensure that the cylinder drain valve (E, fig. 6) is clo-
sed.
Open all the hot and cold water taps or other terminal
fittings.
Open the mains water supply to the VANTAGE and
continue filling until water runs freely from the
terminal fittings, ensuring all air pockets are purged.
Close the terminal fittings and check the system for
leaks.
The system should now be thoroughly flushed.
Open hot water taps at opposite ends of the system
and allow water to discharge for at least 5 minutes.
Close the hot water taps.