Technical data

9 Servicing
Instructions for Installation and Servicing turboMAX pro R328
9.2 Cleaning the burner and primary heat exchanger
Turn off the boiler.
Isolate the electrical supply to the boiler.
Remove the boiler case as described.
Turn off the gas service valve.
Turn off the boiler CH service valves.
Turn off the cold water inlet service valve.
Release the three clamps (1), remove the combustion
chamber cover (2).
Pull the three cables (4) and two tubes (5) from the
fan assembly.
Remove the fan assembly (6a, 6b, 6c).
Remove the four screws (7) and detach the front
cover panel from the combustion chamber (8).
Check the burner (9) and heat exchanger fins (10) and
remove any loose deposits with a soft brush.
Reassemble in reverse order.
Check central heating expansion vessel.
Note!
It is not necessary to carry out this check
every year a check every three years should
be sufficient.
Release the system water pressure from the boiler.
Remove valve cap from expansion vessel charge point.
Check that the internal charge pressure of expansion
vessel is between 0.7 - 0.9 bar. If pressure is lower
than this the vessel should be re-pressurised using an
air pump.
Refit valve cap.
Open central heating service valves and re-pressurise
the boiler and heating system if necessary.
Open the gas service valve.
Turn on the mains power supply.
Operate the boiler and carry out soundness, safety
and function checks.
Complete the service interval record section in the
Benchmark gas boiler commissioning checklist.
Fig. 9.1 Cleaning the burner and primary heat exchanger
6a
6b
7
9
10
8
2
1
5
5
4
6c
833792_41GB_012005.qxd 09.03.2005 16:47 Uhr Seite 28