Installation Manual

26
BOILER INSTALLATION SEQUENCE
Gas supply
(THERMOcompact)
Connect the 15 mm compression
gas service cock (1) and 15 mm
copper outlet tail (3) as supplied
with the appliance and tighten.
Connect a gas supply pipe of not
less than 15 mm diameter to the
copper tail.
Tighten all connections.
(Ensure the gas supply pipework is
adequately sized such that a 20
mbar gas pressure is available at
the boiler inlet at full flow rate).
Euro B/S_VC_027/0
Fig. I.9: Fitting the gas connection THERMOcompact
THERMOcompact